pic
NEWS
/
/
/
Successful Installation of Equipment for Tiantai Mountain Tunnel Project

Successful Installation of Equipment for Tiantai Mountain Tunnel Project

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2021-10-12
  • Views:

(Summary description)

Successful Installation of Equipment for Tiantai Mountain Tunnel Project

(Summary description)

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2021-10-12 11:03
  • Views:
Information

 PROJECT OVERVIEW

This project is mainly divided into two phases. Section I mainly has four fans with rated power of 315 KW and three fans with rated power of 220 KW; Section II mainly has three fans with rated power of 315 KW and three fans with rated power of 220 KW. Each fan is started with 10 kV high voltage soft starting cabinet. There are  13 kV high voltage soft starting cabinets totally.

Program customization

Our company configures high voltage reactive power compensation device to customers according to design requirements and field load conditions. This device plays an important role in improving system power factor, improving power quality, prolonging the service life of power equipment, and reducing transmission loss of power lines and transformers.

Introduction of Tiantai Mountain Tunnel in Qinling Mountains:


The Tiantai Mountain Tunnel is a control project of Baoping Highway with a length of 15.56 kilometers and a total investment of 2.450 billion yuan. The tunnel is 70 meters from the ground vertically and the construction scale is very large.

Keyword:

Scan the QR code to read on your phone

Latest News

这是描述信息

2726472126

Feidong Economic Development Zone LiuZi Road, Anhui Hefei,China

Copyright © 2020   Anhui Zonsen Electric Power Technology Co,Ltd.    Powered by www.300.cn   皖ICP备18026616号